铁岭发电厂是“八五”期间国家重点工程之一,是由辽宁省和国家合资建设的总装机容量为240万千瓦大型火力发电厂(第一期工程装机4×300MW,主机设备是引进美国技术,由哈尔滨三大动力厂制造;辅助设备是由国内厂家配套的。第二期工程装机2×600Mw),是部指定实行新厂新管理办法的试点单位之一。第一台机组于1 993年3月28日提前9个月并网发电。新机按照新的体制和新的管理办法进行了运转。全体职工精心操作,精心维护,保证了安全、稳发、满发。
The Tieling Power Plant is one of the national key projects during the “Eighth Five-Year Plan” period. It is a large-scale thermal power plant with a total installed capacity of 2.4 million kW that was jointly built by Liaoning Province and the State (the first phase of the project is installed with 4×300MW, and the host equipment is introduced into the United States. The technology is manufactured by the Harbin Sanda Power Plant; the auxiliary equipment is supported by domestic manufacturers. The second phase of the project, with an installed capacity of 2×600 Mw), is one of the pilot units designated by the Ministry for the implementation of new management methods for the new plant. The first unit was connected to the grid nine months in advance on March 28, 1993. The new machine operated in accordance with the new system and the new management methods. All staffs are meticulously operated and carefully maintained to ensure safety, stability and full performance.