我厂的两台滚动轮移单链式铸铁机,因铸铁量大,链带的机械磨损快,设备故障较多,经常因铸不完铁水而迫使高炉慢风或休风,因而决定对铸铁机进行改进.一、对链轮、链接板的改进图1为改进前链轮与链接板安装简图.由于链接板与链轮的结构尺寸不合理,当链带稍微跑偏运行到下轨道链接板的圆弧面顶面(A面)时就会与下轨道摩擦.链接板上的A面三轮轴中心线的距离为88mm,大于与轨道接触的链轮半径82.5mm,当链带稍有摆动时,链接板与轨道接触,产生滑动摩擦,使轨道及链接板磨损,增加了运行的机械阻力,导致电机电流加大.进行如下改进(见图2):链轮的直径增加至180mm,链接板两孔中心线至缺口位置的距离由原来的38mm减至30mm.为避免
Because of the large amount of cast iron and the mechanical wear of the chain belt, the equipment has many faults and often forced the slow blast or break of the blast furnace due to the endless casting of molten iron. Therefore, we decided to cast iron 1. Improvement of sprocket and link plate Figure 1 shows the installation of front sprocket and link plate.As the structure size of link plate and sprocket is unreasonable, when the chain runs slightly to the lower rail The upper surface of the arc of the link plate (A surface) will friction with the lower rail. A link on the surface of the hub axle centerline distance of 88mm, greater than the radius of 82.5mm with the track contact sprocket, When there is swinging, the link plate is in contact with the rail, resulting in sliding friction, causing the rail and the link plate to wear, increasing the operational resistance of the motor and increasing the motor current. The following improvements are made (see Figure 2): the diameter of the sprocket is increased to 180mm , The distance between the center line of two holes of the link plate to the notch position is reduced from 38mm to 30mm. To avoid