论文部分内容阅读
日前,中国铁路总公司批复贵州省贵阳市至广西壮族自治区南宁市高铁(贵南高铁)初步设计方案,方案表明贵南高铁北起贵阳北站,向南经龙里、贵定、都匀、独山、荔波和广西的环江、金城江、都安、马山和武鸣等地,终点为南宁铁路枢纽南宁东站,正线全长482 km,其中,贵州境内199 km,广西境内283 km。据了解,贵南高铁全线共设14个车站,设计时速350 km,总投资757.6亿元,建设工
Recently, China Railway Corporation approved the preliminary design proposal of the high speed rail (Guinan High Speed Rail) in Guiyang City, Guangxi Zhuang Autonomous Region to Guilin, Guangxi Zhuang Autonomous Region. The scheme shows that Guinan High Speed Rail runs north from Guiyang North Railway Station to the south via Longli, Guiding, Duyun, Dushan, Libo and Huanjiang, Jinchengjiang, Du’an, Mashan and Wuming in Guangxi. The terminal is Nanning East Railway Station of Nanning Railway. The total length of the main line is 482 km, of which, 199 km in Guizhou, 283 km. It is understood that Guinan high-speed rail across the board a total of 14 stations, the design speed of 350 km, a total investment of 75.76 billion yuan, construction workers