论文部分内容阅读
陕西省水电工程局第二工程处现有职工602名,各种配套施工机械133台,技术装备共计26920马力,是一支职工素质好、技术力量强、管理水平高、能打硬仗的水利水电施工队伍。在石头河水库大坝工程完成后,他们又出色地完成了安康防洪抢险工程,年产值迈过千万元大关。由于守信誉、工效高、质量好,1984年水电部授予“先进集体”称号。1986年7月,新疆黑孜尔水库工程招标承包,二处以综合优势低于标底10.7%中标。二处领导进一步发动全体职工,加强管理,决心以比水电部(80)劳动定额提高28%的
Shaanxi Provincial Bureau of Hydropower Engineering Agency II existing staff of 602, all kinds of supporting construction machinery 133, a total of 26,920 horsepower technical equipment, is a staff of good quality, strong technical force, high level of management, can fight tough battle of the water conservancy and hydropower Construction team. After the dam project of the Shitouhe Reservoir was completed, they completed the well-being flood prevention and rescue project with an annual output value of over 10 million yuan. As Shou credibility, high efficiency, good quality, in 1984 the Ministry of Water Power awarded the “advanced collective” title. In July 1986, Xinjiang Heizier Reservoir Project was contracted for bidding, and the other two won the bid with an overall advantage of 10.7% below the bidding standard. The two leaders further mobilized all staff and workers to strengthen their management and determined to increase their labor quotas by 28% over the MEP (80)