论文部分内容阅读
“七五”期间原煤产量以平均每年9.6%的速度递增,近两年产量比矿井能力提高66.7%,今年一至七月上缴利润5000万元全国“五一”劳动奖状获得单位新汶矿务局协庄煤矿,于1962年建成投产、年设计生产能力120万吨。自“七五”以来,改革运行机制,实现了超常轨、跳跃式发展,取得了累累硕果。“七五”期间原煤产量以平均每年9.6%的速度递增,五年共产原煤789.4万吨,1991、1992年原煤产量突破200万吨以上,比矿井设计能力提高66.7%。今年在煤炭运输受限、市场疲软和
During the 7th Five-Year Plan period, the output of primary coal increased at an average rate of 9.6% per year. In the past two years, the output of the mine increased by 66.7% over the capacity of the mine. During the period from January to July this year, the national “May 1st” labor certificate was awarded and the company’s Xinwen Mining Bureau was awarded with a profit of RMB 50 million. Xiezhuang Coal Mine was completed and put into production in 1962 with an annual production capacity of 1.2 million tons. Since the “7th Five-Year Plan”, the operating mechanism for reforms has achieved supernormal track and leapfrog development, and has made numerous achievements. During the “Seventh Five-Year Plan” period, raw coal production increased at an average rate of 9.6% per year. The total output of raw coal was 5.894 million tons in five years. In 1991 and 1992, the output of raw coal exceeded 2 million tons, which was 66.7% higher than the mine design capacity. This year, coal transportation is limited, the market is weak, and