大伙房水库输水(二期)工程输水隧洞为浅埋有压隧洞,穿越大型河谷段采用钢管连接,沿线布设了各类仪器,设监测站,建立了自动化安全监测系统。通过采集、整理、整编、分析工程施工期、通水调试阶段及运行初期的监测资料,及时了解、掌握输水隧洞的运行情况,从而为工程的运行调度、维护检修提供可靠的依据。
Dahuofang Reservoir Water Conservancy Project (Phase II) The water conveyance tunnel is a shallow buried pressure tunnel and is connected by steel pipes through large river valley sections. Various types of instruments and monitoring stations are set along the road and an automatic safety monitoring system is established. Through the collection, collation, reorganization and analysis of the construction period, the water through the commissioning phase and early monitoring data, keep abreast of and grasp the operation of the water tunnel, so as to provide a reliable basis for the operation of the project scheduling, maintenance and overhaul.