论文部分内容阅读
枣庄矿务局八一煤矿选煤厂,是一座设计能力为年处理原煤120万t的群矿型选煤厂。1970年8月1日投产,由我国自行设计。八一煤矿选煤厂主要服务于八一水力采煤矿井,该矿为设计能力75万t/年的全水力化矿井,同时具有外来煤入洗系统。投产以来,除主要入洗八一煤矿原煤外,还入洗本局滕南煤田的柴里、蒋庄矿原煤。选煤厂采用混合跳汰、煤泥浮选的联合工艺。投产以来,由于不断的进行技术改造,生产系统日
Zaozhuang Mines Bureau Bayi coal preparation plant, is a design capacity of 1.2 million tons of raw coal processing group mines coal preparation plant. August 1, 1970 put into production, designed by China. The Bayi Coal Preparation Plant mainly serves the Bayi hydropower coal mine, which is a fully hydraulic coal mine with a design capacity of 750,000 t / a and a foreign coal washer system. Since put into operation, in addition to the main raw coal into the Bayi coal mine, but also into the Tengnan coal field in this Chamber Chaili, Jiangzhuang coal. Coal preparation plant using a mixture of jig, coal flotation of the joint process. Since put into production, due to continuous technological transformation, production system day