论文部分内容阅读
本文介绍了提高熔铜柴油坩埚炉供风量,改变加料顺序,改进炉型,从而使每炉250公斤的铜合金熔化时间缩短到40分钟的经验。
This article describes the experience of increasing the air flow to a melting pot of copper and diesel crucibles, changing the loading sequence, and improving the furnace pattern to shorten the melting time of 250 kg of copper alloy per kilo to 40 minutes.