汾河二库水利枢纽工程的导流设计

来源 :水利水电技术 | 被引量 : 0次 | 上传用户:Johnnywang03
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
汾河二库水利枢纽地处汾河悬泉寺河道“S”形近直线段,河谷呈“U”形,两岸边坡陡峭,河床覆盖层为含泥砂砾石,平均厚度26m.坝区7~9月为汛期,洪枯流量相差悬殊,洪峰尖瘦,据规范选择导流标准P=5%洪水,相应流量为2040m3/s.导流方式采用全河一次断流,隧洞导流.经比较,导流方案为8m城门型隧洞泄洪,上游围堰挡水,堰高为24.35m.截流时段定于10月上旬,设计流量为13m3/s,戗堤总方量为5500m3. The Fenhe II reservoir project is located in the near-straight section of the “S” shape of the river in the Xuquanquan River in Fenhe. The river valley is “U” shaped with steep slopes on both sides of the riverbed. The riverbed cover is silt-gravel with an average thickness of 26m. The dam area is from September to September with flood season, the difference between flood and dry flow is huge, and the peak of peak is thin. According to the standard, the diversion standard of P = 5% is selected and the corresponding flow is 2040m3 / s. The diversion method uses a river cut off, tunnel diversion. After comparison, the diversion scheme is to flood discharge of 8m gated tunnel and the upstream cofferdam is blocked, and the weir height is 24.35m. Closure period scheduled for early October, the design flow of 13m3 / s, embankment total volume of 5500m3.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
现阶段我国在科学技术领域得到了很大程度的发展,对于许多行业都引用了数字信号的应用,因此对于信号的处理还有收集具有重要的意义所在,均可以有效的推进数字应用的不断发展,
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
按照国家标准{GB/T3543.1—1995农作物种子检验规程》规定,种子的纯度、净度、发芽率、水分含量4项质量指标是种子质量监督检验的必检项目。其质量指标执行的是国家强制性标准。
每年的秋冬季节,正是红薯、木薯、葛根的收获季节,过去这些农产品的加工都是农民自己挑着农产品赶远路去加工点,还得排队等候,生产效益很低。根据这种情况,该县农村一些有经济头脑
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
2000年第三季度获农业部《农业机械推广许可证》产品及生产企业目录 Third quarter of 2000 by the Ministry of Agriculture “agricultural machinery to promote permits