黄沙坪铅锌矿扩建的箕斗井和溜矿井位于石英斑岩体中,岩体稳固。溜矿井深从273米至56米,且与各中段平巷相联通,除56米中段井筒直径5米的为混凝土支护外,其余断面直径为3米,无支护。施工方法是165米以上用深孔分段爆破法,165米以下采用吊罐掘进,全工程无地质素描记录。施工时发现92米中段与56米中段的溜井附近平巷有涌水断裂带冒水,但未采取措施进行处理。1984年提升系统竣工试产,出现溜矿井于56米至92米一段涌水量达30(米~3/小时)左右,提升箕斗内有1/3是水,计量装置室水量大,大量的粉矿被水冲入粉矿仓,造成粉矿仓的粉
The Huangsaping lead-zinc mine expansion of the skip well and slipped mine is located in the quartz porphyry body, rock solid. Sliding mine depth from 273 meters to 56 meters, and with the middle section of lanes connected, except for 56 meters in the middle section of the wellbore diameter of 5 meters for concrete support, the remaining section diameter of 3 meters, no support. Construction methods are more than 165 meters with deep hole blasting method, 165 meters below the use of hanging tank heading, the whole project without geological records. During the construction, it was found that there was a gushing fault near the slipway in the 92-meter middle section and the 56-meter middle section, but no measures were taken to deal with it. In 1984, the system was completed and trial production was completed. There was a gushing water volume of about 30 (m ~ 3 / h) from 56m to 92m in the sloping mine and 1/3 of the water in the lifting scoop. Large volume of water Powder ore is pulverized into powder ore warehouse, resulting in pink ore warehouse