论文部分内容阅读
由于工农业的飞跃发展,全国很多地区已先后出现了缺电的情况,山西省各工业地区,也同样出现了电源紧张的现象。要解决电源不足的问题,必须贯彻两条腿走路的方针。一方面要加速基建安装,使新机组早日投入生产,这是最根本的办法。另一方面要挖掘现有设备的潜力,采取一切有效的措施,以缓和电力不足的局面。快速检修就是重要的措施之一。我们
Due to the rapid development of industry and agriculture, power shortages have occurred in many regions of the country, and power shortages have also occurred in various industrial regions in Shanxi Province. To solve the problem of insufficient power, we must implement the principle of walking on two legs. On the one hand, it is necessary to speed up the installation of infrastructure so that new units can be put into production as soon as possible. This is the most fundamental method. On the other hand, we must tap the potential of existing equipment and take all effective measures to ease the situation of power shortage. Quick repair is one of the important measures. we