以深圳地铁7号线珠光站机电安装工程为例,针对地铁机电安装管线错综复杂、空间不足等特点,结合现场条件对地铁车站管线综合支吊架的构成及技术要求进行阐述,对今后地铁综合管线安装提供参考。
Taking the installation of electromechanical project in Shenzhen Metro Line 7 as an example, this paper describes the composition and technical requirements of the integrated support hanger of metro station line in light of the complex and insufficient space of subway electromechanical installation pipeline and the on-site conditions. Installation for reference.