论文部分内容阅读
1 一项水利工程,往往耗资巨大,在设计和施工中的每一点差错和延误,都可能造成巨大的浪费,带来无法弥补的损失。作为多年从事水利工作的工程技术人员,赵广德深知责任之重。为从根本上解决天津市缺水问题,1982年,中央决定修建引滦入津工程。这是一项综合性、跨流域的大型水利工程,全长约234公里,其中包括开凿12公里长的引水隧洞。在当年抗倭名将戚继光重修长城的燕山脚下,天津市水利局赵广德工程师担任引滦入津工程中最关键、最艰巨的引水隧洞破碎带的项目负责人。在这场人类征服自然和改造自然的战斗中,塌方
1 A hydraulic project is often costly and every single mistake and delay in design and construction can result in huge waste and irreparable damage. As engineering and technical personnel engaged in water conservancy work for many years, Zhao Guangde understands the responsibility. In order to fundamentally solve the problem of water shortage in Tianjin, in 1982, the Central Government decided to construct the Luan River to Tianjin Project. It is a comprehensive, inter-basin, large-scale water project with a total length of 234 kilometers, including the excavation of a 12-kilometer diversion tunnel. In the same year, anti-Japanese star Qi Jiguang restructured the Great Wall at the foot of Yanshan, Tianjin Water Conservancy Bureau Zhao Guangde engineer Luan River into the Tianjin project as the most critical and most dredging diversion project leader. In this battle of human conquest of nature and transformation of nature, landslides