论文部分内容阅读
针对目前铁路机务段运行揭示LKJ临时数据编制作业依靠人工核对、确认,存在错漏风险,引入“机控”手段,达到提高工作效率、保证数据正确性的目的。
Aiming at the current operation of railway locomotive depot, LKJ temporary data compilation work has to rely on manual verification to confirm that there is a risk of mistakes and omissions. The introduction of “machine control ” means to improve work efficiency and ensure the correctness of data.