1972年11月列别金斯克采选联合公司的第一、第四系统投入生产,该公司第一期的总的设计生产能力是年处理原矿石15000万吨。并于1973年建成。这是苏联采用自磨矿的方法来磨石英岩的第二个选矿厂。上述磨矿方法的选矿厂典型设备联系图见图1。列别金斯克采选联合企业选矿厂的特点是
In November 1972, the first and fourth systems of Liebjinsk Mining and Allied Coalition were put into production. The total design production capacity of the first phase of the company was 150 million tons of raw ore processed annually. It was completed in 1973. This is the second ore dressing plant used by the Soviet Union to mill quartzite by a self-grinding method. The above method of ore dressing plant typical equipment contact diagram shown in Figure 1. Liebjinsk Mining and Dressing Complex is characterized by