论文部分内容阅读
针对某新建项目存在的外窗渗水问题进行了现场检测,在淋水试验的基础上查明了渗水原因,同时对附属构筑物——生化污水池的倾斜情况进行了实测和原因分析,并就该项目的外窗渗水和生化污水池倾斜提出了相应的整改建议。这些可为类似工程问题的处理提供参考依据。
Aiming at the problem of seepage outside the window of a newly built project, the cause of water seepage was ascertained on the basis of the water pouring test. Meanwhile, the inclination of the affiliated structure-biological sewage pool was measured and analyzed. Project external window seepage and biochemical cistern inclined proposed corrective recommendations. These can provide a reference for the treatment of similar engineering problems.