论文部分内容阅读
四川石油管理局总机修厂的技术档案工作,原来基础十分薄弱,图纸散乱,档案不全不准,曾给工作和生产带来了一定的影响和损失。今年二至六月,根据上级指示,该厂党委下定决心,由副厂长挂帅,组织力量,突击整理、核对和补制,划分了保管期限,改善了保管条件,建立了制度。整个清理任务按原计划提前六个月完成,成绩大,效果好。共整理了主要产品、设备等技术图纸文件一百多种(套),其中补描补制的图纸
Sichuan Petroleum Administration switchboard repair technical file work, the original foundation is very weak, scattered drawings, incomplete files are not allowed, has given work and production have a certain impact and loss. From February to June this year, according to instructions from higher authorities, the party committee of the factory made up its mind and was commanded by the deputy director to organize forces, assault, collate and replenish the documents, divide the period of storage, improve the storage conditions and establish a system. The entire cleaning mission was completed six months in advance according to the original plan and the result was good and the result was good. A total of a total of more than 100 kinds of technical drawings and documents (sets) of main products, equipment, etc., drawings