论文部分内容阅读
结合天津地铁1号线下瓦房站工程实际,分析了车站工程中地下连续墙冬季施工所存在的问题,并提出相应的冬季施工质量管理措施和冬季施工安全措施.
Combined with the actual project of Tianjin Metro Line 1 Wawahu Station, this paper analyzes the problems existing in winter construction of underground continuous wall in station engineering and puts forward corresponding winter construction quality control measures and winter construction safety measures.