论文部分内容阅读
我国经济比较发达的华东、中南、东北等地区,煤炭资源较缺,运输能力不足,水能资源又较少,电力生产在质和量上都不能满足生产发展的要求。然而在这些地区尚有一批可开发的中型水电站站址。它的开发工期较短,收效较快,有利于缓解这些地区缺电的紧张局面。但因国家投资有限,这些电站迟迟得不到开发。能否用集资的办法来兴建呢?显然,要集资兴建中型水电站,就要回答:用什么方式筹措资金,电站产权归谁,效益如何分配以及应该
China’s economically developed areas such as East China, Central South, and Northeast China have relatively low coal resources, insufficient transportation capacity, and few hydropower resources. Power production cannot meet the requirements of production development in terms of quality and quantity. However, there are still a number of exploitable medium-sized hydropower stations in these areas. Its short development period and quick results will help alleviate the shortage of electricity in these areas. However, due to the limited investment of the state, these power plants have not been developed for a long time. Can we use the method of fund-raising to build it? Obviously, to raise funds for the construction of medium-sized hydropower stations, it is necessary to answer: What are the ways to raise funds? Who should the property rights of the power station belong to? How should the benefits be distributed?