要解决卫生间的渗漏问题,应抓住以下几个质量控制点。一、管道施工管道施工应首先抓好上、下水管道穿楼板预留洞的留置。要认真核对图纸,依据图纸准确定位,将上、下水管道纵横尺寸和上、下水管道之间的距离掌握准确,并认真配合土建施工,不能遗漏,避免剔凿楼板。
To solve the leakage of the bathroom, we should seize the following quality control points. First, the construction of pipelines Pipeline construction should first do a good job on the sewer pipe through the floor reserved hole indwelling. To carefully check the drawings, accurate positioning according to the drawings, the vertical and horizontal dimensions of the upper and lower water pipes and the distance between the upper and lower water pipes to master accurate and conscientiously with civil construction, can not omit to avoid ticking floor.