介绍了路基上CRTSⅡ型板式无砟轨道支承层施工工艺,通过采取一些专用设备、一些控制措施,保证了支承层的施工质量,同时也满足施工进度要求,为后续路基段CRTSⅡ型无砟轨道板顺利铺设创造了条件。
The construction technology of CRTS Ⅱ slab ballastless track supporting layer on the roadbed is introduced. By adopting some special equipment and some control measures, the construction quality of the supporting layer is ensured, and the construction progress is also met at the same time. The CRTS Ⅱ ballastless track slab Smooth laying created the conditions.