淮河流域水文随机方法的径流图化(英文)

来源 :Journal of Geographical Sciences | 被引量 : 0次 | 上传用户:Aslaen
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Theoretical difficulties for mapping and for estimating river regime characteristics in a large-scale basin remain because of the nature of the variable under study: river flows are related to a specific area, i.e. the drainage basin, and are hierarchically organized in space through the river network with upstream-downstream dependencies. Another limitation is there are not enough gauge stations in developing countries. This presentation aims at de-veloping the hydro-stochastic approach for producing choropleth maps of average annual runoff and computing mean discharge along the main river network for a large-scale basin. The approach applied to mean annual runoff is based on geostatistical interpolation proce-dures coupled with water balance and data uncertainty analyses. It is proved by an applica-tion in the upstream at Bengbu in the Huaihe River Basin, a typical large-scale basin in China. Hydro-stochasitic approach in a first step interpolates to a regular grid net and in a second step the grid values are integrated along rivers. The interpolation scheme includes a con-straint to be able to account for the lateral water balance along the rivers. Grid runoff map with 10 km × 10 km resolution and the discharge map along the river with the 1 km basic length unit are the main results in this study. This kind of statistic approach can be widely used be-cause it avoids the complexity of hydrological models and does not depend on the meteoro-logical data. Theoretical difficulty for mapping and for estimating river regime characteristics in a large-scale basin remain because of the nature of the variable under study: river flows are related to a specific area, ie the drainage basin, and are hierarchically organized in space through the river Another limitation is there are not enough gauge stations in developing countries. This presentation aims at de-veloping the hydro-stochastic approach for producing choropleth maps of an average annual runoff and computing mean discharge along the main river network for a large-scale basin. The approach applied to mean annual runoff is based on geostatistical interpolation proce-dures coupled with water balance and data uncertainty analyzes. It is proved by an application- the upstream at Bengbu in the Huaihe River Basin, a typical large-scale basin in China. Hydro-stochasitic approach in a first step interpolates to a regular grid net and in a secon d step the grid values ​​are integrated along rivers. The interpolation scheme includes a con-straint to be able to account for the lateral water balance along the rivers. Grid runoff map with 10 km × 10 km resolution and the discharge map along the river with the 1 km basic length unit are the main results in this study. This kind of statistic approach can be widely used be-cause it avoids the complexity of hydrological models and does not depend on the meteoro-logical data.
其他文献
中共中央政治局7月25日上午进行第三十三次集体学习,学习安排的内容是红军长征胜利的回顾和思考。军事科学院军事历史研究所陈力研究员、科研指导部副部长黄星研究员就这个问
一位痴迷网吧的漂亮女大学生,在网上结识了一个叫“冬冬”的网友,没想到两人愈聊愈投机,很快发展成了网上恋人。即将出国留学的女大学生怎么也没料到,痴情的她千里迢迢赶去
最近,一个来自美国Craigslist网络社区的帖子热遍国际,堪称经典。主贴:“本人25岁,非常漂亮,谈吐文雅,有品位,想嫁给年薪50万美元的人。你也许会说我贪心,但 Recently, a po
以宜昌水文站为例,针对不同时期河流生态系统对水文条件的需求,基于熵权、生态适宜性理论,构建了长江干流宜昌站近50年逐日适时划分水文指标模型,分析了流量、时间、频率、变
一把扫帚扫走了黑夜;一辆小车推来了黎明。在黑暗与光明交替的时刻我们清扫!扫走败叶,剔除枯枝。肮脏,属于过去,清洁,在我们手中创造。我们,是改革者!铁锹,撮走灰蒙蒙的旧世
河南省疟疾发病纵向监测报告钟园国宋金铎李东方冯石献颜秋叶河南省卫生防疫站(郑州450003)1978~1995年,在我省不同类型地区固始、南阳、鹿邑、遂平、封丘和伊川6县,建立了疟疾流行病学监测站,对疟
我院于1995年6月收治一例重症急性胰腺炎患者.在治疗过程中,选用新的人工合成生长抑京八肽——善得定(Sando。tatin)进行治疗,疗效满意,现报告于后:患者女性.60岁,\族,Z婚,干部,住院号:9507
当有些上年纪的人,在红日衔山的傍晚,看见美丽的晚霞,往往会情不自禁地感叹:“夕阳无限好,只是近黄昏。”其实大可不必如此。我有一次在电视中见到一队退休的妇女表演集体舞
针对马斯京根法区间河道流量演算的缺陷,以未来金沙江下游溪洛渡、向家坝水库与三峡水库的梯级优化运行为例,分别构建了马斯京根流量演算模型与人工神经网络流量演算模型,并
时空守护者之全新领域
期刊