论文部分内容阅读
白云水电站混凝土面板堆石坝位于湖南省邵阳的巫水上游,大坝最大高度120m,已于1998年12月26日投入使用。混凝土面板采用通常的施工方法施工。由于面板堆石坝中的混凝上面板是一种较为新兴的工程项目,在现有定额中尚是缺项,过去通常套用混凝土斜墙定额,往往差异较大。在白云电站面板堆石坝的混凝土面板施工中,从实际出发,探索、总结了一套混凝土面板施工定额,以弥补这方面的缺项。
The concrete face rockfill dam of Baiyun Hydropower Station is located in the upper reaches of Wu Shui in Shaoyang, Hunan Province. The dam has a maximum height of 120m and was put into operation on December 26, 1998. Concrete panels using the usual construction methods of construction. Since the concrete upper panel in the CFRD is a relatively new project, there is still a shortfall in the existing quotas. In the past, the quota of concrete inclined walls was usually applied, often with large differences. In the construction of concrete slabs of Baiyun Hydropower Station, from a practical point of view, a set of concrete panel construction quota was summed up to make up for this lack.