本组同志一致抱着三峡枢纽设计早日实现的强烈愿望,并认为长办同志们在党的正确领导下;在三峡枢纽设计工作上作出了辉煌的成绩。本组讨论以美Ⅷ坝线第二施工方案为中心,认为这个方案是基本正确的。对今后工作提出以下意见:1.关于施工组织机构本工程的施工日期虽然有待国务院的决定,但由于工程非常艰巨,筹备工作宜早日着手,目前施工技术设备供应紧张,三峡工程需要量大,有些机械设备还须经过设计;试制过程才能正常生产,必须即早定货或交付设计试制任务。技术力量尤须早日着手培训。建议尽早把施工筹备机构成立起来,
The comrades in this group unanimously embraced the strong desire for the early realization of the design of the Three Gorges Project, and believed that the long-standing comrades under the correct leadership of the Party had made brilliant achievements in the design work of the Three Gorges Project. The group discussed the second construction plan of the US VIII dam line as the center, and considered this plan to be basically correct. The following opinions are proposed for future work: 1. Regarding the construction organization The construction date of this project is to be decided by the State Council. However, due to the arduous project, preparations should be started as soon as possible. Currently, the supply of construction technology and equipment is tight, and the Three Gorges Project requires a large quantity. The mechanical equipment must also be designed; the trial production process can be normal production, and the order must be ordered as soon as possible or delivered. The technical force must especially begin training early. It is recommended that the construction preparatory body be established as soon as possible.