笔者参考深圳市深业上城(南区)塔2工程的施工作业,简介了钢管混凝土中高抛自密实混凝土的施工。其通常包含施工前的预备作业、混凝土的浇灌,施工阶段的质量管控、原料管控、计量以及运输管控、混凝土的现场验收、质量检测等,并简介了钢管混凝土的常规检验模式。
The author refers to the Shenzhen City Industrial Park (South) Tower 2 project of the construction operations, introduced in the concrete filled high-density self-compacting concrete construction. It usually includes preparatory work prior to construction, watering of concrete, quality control during construction, raw material management, metering and transportation control, on-site acceptance of concrete, quality inspection, etc., and general inspection modes of CFST.