柳州市南二环路桐油山隧道采用双连拱结构,具有大跨度、浅埋偏压、溶洞发育等特点,浅、深埋地段分别采用双侧壁-中导洞、中导洞-正台阶法分部开挖,提出了受浅埋偏压及断层影响时确定左、右隧施工顺序的原则。在大型粘土充填溶洞地段采用左、中、右钢筋混凝土地基梁跨越处理,针对双连拱隧道易出现渗水的通病,总结了一套实用的防水施工方法。介绍了简易自制的钢拱架冷弯设备,并对中墙顶部回填施工、受力体系转换进行了介绍。
The Tongyashan Tunnel of South Second Ring Road in Liuzhou City is characterized by double-arch structure with large span, shallow bias and cave development. The shallow and deep sections are respectively made of double-sided walls - middle guide tunnel, middle guide tunnel - positive step Law divisional excavation, put forward the principle of determining the order of construction of the left and right tunnels under the influence of shallow bias and fault. In the large-scale clay-filled cave sections, the left, middle and right reinforced concrete foundation beams are cross-treated. Aiming at the common problems of double-arch tunnel seepage, a set of practical waterproofing construction methods are summarized. The cold-formed equipment of simple self-made steel arch frame is introduced, and the backfilling construction of the top of the middle wall is introduced.