论文部分内容阅读
磨励王洪全,原是滇北电业局修试所的继电保护技术人员,现为昭通供电局修试所继保班班长。这位年轻的小伙子,于1999年7月毕业于武汉水利水电大学继电保护及自动远动专业,进入当时的滇北电业局。刚刚参加工作,他就历经了无数次的考验与挑战:1999年11月,110千伏者海变电站综合自动化改造,这是他第一次独立工作;2000年,110千伏东川变电站10千伏旁路系统技术改造,他小试牛刀,第一次承担部分系统设计任务;
Inspire Wang Hongquan, was originally the North Dianbei Electric Power Bureau repair test of the relay protection technicians, Zhaotong Power Supply Bureau is now the repair test class monitor. The young boy, graduated from Wuhan University of Water Resources and Hydropower in July 1999, relay protection and automatic telecontrol professional, entered the then northern Yunnan Electric Power Bureau. He had gone through numerous tests and challenges since he first joined the workforce: in November 1999, the comprehensive automation of the 110-kilovolt sea substation was his first independent work; in 2000, the 110-kilovolt Dongchuan substation was 1,000 V bypass system technology transformation, he is a small test chopper, for the first time to undertake some system design tasks;