锚杆在高层建筑深基础中应用已经日渐增多,目前已完成的工程有北京国际大厦、王府井饭店、中国科技活动中心、华府大厦、新华社新楼和沈阳中山大厦等工程。正在施工的还有北京京城大厦(53层,地下深23m)、京广大厦等。这些工程有的采用地下连续墙、有的是大直径灌注桩、有的是用H型钢作为挡土墙,都采用锚杆作拉杆,用一层或几层锚杆,其主筋有的用粗钢筋,有的用钢绞线。高层建筑因地基基础、建筑功能和抗震的需要,基础往往做得较深,放坡大开挖土方做基础的方案已不可行,已被挡土墙
The use of bolts in the deep foundations of high-rise buildings has been increasing. Currently completed projects include Beijing International Building, Wangfujing Hotel, China Science and Technology Activity Center, Washington Mansion, Xinhua News New Building, and Shenyang Zhongshan Building. Also under construction are the Beijing Jingcheng Building (53 floors, underground depth 23m) and Jingguang Building. Some of these projects use underground diaphragm walls, some are large-diameter cast-in-place piles, some use H-shaped steels as retaining walls, and all use anchor rods as tie rods. One or more layers of anchor rods are used. Some of the main reinforcements are made of thick steel reinforcement. With strand. High-rise buildings often have deep foundations due to the foundation of foundations, building functions and earthquake-resistance needs. It is no longer feasible to use sloping and excavation earthwork as the foundation, and has been used as a retaining wall.