1996年7月与8月上旬,漳河水库流域普降暴雨,出现了三场较大洪水,均为建库以来历史之最高记录,水库调度人员经过周密地分析和计算,针对各场洪水的不同特点,拟定了相应的实时预报或错峰调度方案,在湖北省省防汛指挥部的统一指挥下,顾全大局,主动承担困难和风险,经过4次有效的关闸错峰,最大限度地发挥了水库调蓄洪水的作用,减轻了下游防洪压力,为夺取沮漳河抗御超历史最高水位洪水斗争的胜利创造了条件,漳河水库防洪减灾效益达26.58亿元。
In July 1996 and the first ten days of August, there were three heavy floods in the Zhanghe reservoir basin, all of which were the highest in history since the foundation of the reservoir. After careful analysis and calculation, Different characteristics, drafted a corresponding real-time forecast or peak shifting schedule, under the unified command of the flood control headquarters in Hubei Province, taking into consideration the overall situation, take the initiative to take the trouble and risk, after four effective gate off peak, maximum play The reservoir flood control function, reduce the pressure on downstream flood control, in order to seize the Ju Zhang Zhang River flood defense ultra-history of the highest water level victory to create conditions for flood control and flood relief Zhanghe reservoir reached 2.658 billion yuan.