钢结构厂房质量控制的重点是钢结构工程的构件制作和安装。通过自身的工程实例,对钢结构工程从事前质量控制、钢结构制作及安装直至围护压型钢板安装全过程的施工质量控制进行了阐述,并对施工中易产生质量偏差的部位和关键工序提出了相应的控制措施和要点,以事前控制与事中控制相结合的方法,实施项目全过程质量监控,确保钢结构工程的施工质量始终处于受控状态。
The focus of quality control of steel plant is the fabrication and installation of steel structure engineering components. Through its own engineering examples, the quality control of steel structure engineering in front of quality control, steel structure fabrication and installation up to the entire process of the installation of the retaining profiled steel plate is described. The parts prone to quality deviation during the construction and the key processes Put forward the corresponding control measures and key points, with the combination of pre-control and incident control, the quality control of the whole project is implemented to ensure the construction quality of the steel structure project is always under control.