论文部分内容阅读
由于我们在党的领导下充分发挥了主观能动性,初步地掌握了生产发展客观规律,认清了人与物的关系,基本上适应了电力工业送电线路基本建设施工的需要,因此我班出现了从1954年到1960年七年不倒杆安全生产的大好局面。这一大好形势进一步提高了广大施工人员的斗志,促使我班各项工作取得了全面大跃进。首先在施工速度上是空前的,我们曾从日立3基杆提高到日立18基,175基杆只用了28天,比计划数提前了42天;又如一次在山区浇制基础工序中,创造了日
As we have fully exerted subjective initiative under the leadership of the party, we have initially grasped the objective laws of production development, recognized the relationship between people and things, and basically adapted to the needs of the basic construction and construction of power transmission lines in the power industry, so our class appeared. In the seven years from 1954 to 1960, there was an excellent situation in which safe production was not reversed. This excellent situation has further increased the fighting spirit of the vast number of construction workers, and has led to a full-scale leap forward in all aspects of our work. First of all, the construction speed is unprecedented. We have increased from the Hitachi 3 base to Hitachi’s 18 bases. The 175 bases only took 28 days, 42 days earlier than planned. Another example is the basic process of pouring in the mountains. Created the day