论文部分内容阅读
由于平顶山市孤石滩水库除险加固工程溢洪道进行了拆除重建,采用折线型实用堰,无法采用常规的宽顶堰计算其泄流能力,为准确地计算其泄流能力,采用数学模拟和水工模型相结合的手段,重点研究了溢洪道泄流量、沿程水面线、流态、消能效果等,优化溢洪道方案,提出推荐方案,为最终采用的设计方案提供依据。
Due to the demolition and reconstruction of the Besshan Reservoir Reinforcement Project spillway in Pingdingshan City, we can not calculate the discharge capacity by using the conventional wide crest weir. In order to accurately calculate the discharge capacity of the spillway, we use mathematical simulation and water This paper focuses on the discharge of spillway, the waterline, flow pattern and energy dissipation along the waterway to optimize the spillway scheme and put forward the recommended scheme to provide the basis for the final design.