论文部分内容阅读
浙江绍兴县第七纺织厂宽幅高强针刺土工布生产线建成投产,产品正源源不断地运往长江干流江岸堤防加固整治工程,要货订单络绎不绝。据悉,该厂自6月份正式投产至今,接收的订单已达20万m~2,生产土工布的总量已达5万m~2。这标志着作为省重点科技攻关项目的6m宽幅高强针刺土工布生产流水线已顺利建成投产,从而结束了浙江省土工布生产只有2.1m门幅以下,而没有生产4m以上能力企业的历史。土工布作为一种新型的工程材料,其市场潜力很大。绍兴县第七纺织厂抢抓时机,通过广泛的市场调查,与省产业用纺织品协会和有关科研院
The high-strength, high-strength acupuncture geotextile production line of the No. 7 Textile Factory in Shaoxing County, Zhejiang Province was completed and put into production. The products are continuously being transported to the embankment reinforcement and rectification projects along the mainstream of the Yangtze River, and orders for goods are in constant flux. It is reported that since the plant was officially put into operation in June, orders received have reached 200,000 m2, and the total amount of geotextiles produced has reached 50,000 m2. This marked that the 6m-wide high-strength acupuncture geotextile production line as a key scientific and technological project of the province has been successfully completed and put into production, thus ending the history of Zhejiang Geotextile production with a width of only 2.1m and not producing enterprises with capacities of more than 4m. As a new type of engineering material, geotextile has great market potential. Shaoxing County No. 7 Textile Factory seizes the opportunity, through extensive market research, with the Provincial Industrial Textile Association and related research institutes