论文部分内容阅读
根据云南目前的出境通道现状及建设直入印度洋通道的目的和要求,确定通道建设的总体思路、指导思想、布局重点和建设步骤如下: 一、总体思路 建设直入印度洋的“云南通道”的总体思路是:在云南对外通道建设应“中路突破,两翼起飞,先通后畅,立体发展”的总体格局下,加快进入印度洋通道的建设。即以中国昆明-缅甸仰光伊洛瓦底江陆水联运通道(以下简称中缅陆水联运通道)为突破口,加快建设昆明-新加坡铁路,积极筹划开通第三座亚欧非大陆桥,形成三
According to the current status quo of outbound passage in Yunnan and the purpose and requirements of establishing a direct access to the Indian Ocean, the overall mentality, guiding ideology, layout and construction steps of the passage construction are to be determined as follows: I. General Idea The general idea of building the “Yunnan Passage” into the Indian Ocean is : Speeding up the construction of the channel for the entry into the Indian Ocean under the general pattern of establishing “a mid-road breakthrough, a two-wing takeoff, first and second development, and three-dimensional development” in the construction of the external corridor in Yunnan. That is, take the Kunlun-Myanmar Yangon Irrawaddy River land and water transport corridor (hereinafter referred to as China-Myanmar land and water transport corridor) as a breakthrough to speed up the construction of Kunming-Singapore Railway, and actively plan to open a third Asia-Europe non-land bridge to form three