白山水电站蓄水初期的经济效益

来源 :东北水利水电 | 被引量 : 0次 | 上传用户:nikun0081
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
白山水电站是东北地区最大的水电站。总装机容量150万千瓦,单机容量30万千瓦。一期工程第一台机组于1983年12月30日发电,1984年末,一期工程三台机组共90万千瓦已全部投产运行。续建工程将在左岸地面厂房内装机两台计60万千瓦。现正在施工中。目前大坝尚未竣工,电站是在边施工、边蓄水、边发电,为蓄水初期运行阶段。三 Baishan Hydropower Station is the largest hydropower station in Northeast China. The total installed capacity of 1.5 million kilowatts, stand-alone capacity of 300,000 kilowatts. The first unit of the first phase of power generation on December 30, 1983 power generation, the end of 1984, a project three units a total of 900,000 kilowatts have been put into operation. Continued construction will be installed on the left bank of the ground floor of two 600,000 kilowatts. Now under construction. At present, the dam has not been completed yet. The power station is carrying out construction while reserving water and generating electricity for the initial stage of water storage. three
其他文献
1.原滑线装置(滑线固定在每组支架上) 我厂于1974年和1978年各投产一台5吨40米门式抓斗起重机(简称龙门抓)。原设计供电电源滑线全长420米为GLCA—100/215型,标称截面215mm~
建立高程控制网是水电工程测量的首要任务,在工程勘测、设计、施工、安装等各阶段,需要做大量的几何水准测量工作,这是一项量大而又细致的作业过程。由于西南地区的水电建设
本项研究以Talmy的词汇化理论为框架,先分析言说事件的概念结构,然后参照词典和先前研究的语料,按言说事件语义结构对言说动词进行语义切分,然后进行对比分析,旨在探究英汉言
即兴演讲是人们生活、工作中常见和常用的一种表达形式。即兴演讲有特定的要求和特点,其独有的形式和方法往往给演讲者带来一些困惑。在即兴演讲过程中,演讲者一般会面对几个
(一)概况涢水流经湖北省随州市西南,自大洪山至府河汇流处总落差为111.7m。1966~1979年先后建成梯级水电站10座,共利用水头85.1m,装机20台,总装机容量4,035KW。10座梯级电站
钻孔施工过程中,往往出现钻进到一定孔深后,钻孔弯曲超过了设计的最大允许偏差,如继续施工到终孔,显然不能满足地质要求,因此必须从技术上采取措施,进行稳斜或纠斜。采取措施后是否
中职班级管理具有一定的难度,也是班主任工作的一项重要内容。中职班主任在进行班级管理时要掌握班级管理的艺术,提高班级管理的效果。 Secondary vocational class managem
中职计算机课程是中职教育的重要组成部分,是提高学生信息技术能力的重要方式。计算机作为一门相对独立的实践学科,而中职学生普遍基础差、学习主动性等特点,计算机教学更需
大足石刻碑文是大足石窟的重要組成部分,而《大足石刻銘文錄》是迄今為止收錄大足碑記最多的開拓性著作。但在辨識大足石刻俗字方面,卻有待商榷。本文運用文字考釋的相關知識
该所始建于1958年.现设工程水文及水资源、岩土工程、水工水力学、水工结构、工程结构、水工防渗及农田水利等7个研究室.分属于工程水文及水资源、岩土工程、水工结构工程、