论文部分内容阅读
冬期施工实例,介绍蓄水池及基础施工采用ZB—3复合防冻剂和低温蒸养综合蓄热措施的情况。
In the winter construction example, the ZB-3 combined antifreeze and low-temperature steaming and comprehensive heat storage measures were adopted for the reservoir and foundation construction.