三峡水库蓄水后,将形成众多面积大小不等、形态各异的库湾及消落区,为我们进行渔业开发提供了巨大的空间。一、三峡水库工程建设的进度和三峡水库水位年度变化规律1、三峡水库工程建设分4个阶段。从施工准备(1993年)开始,至1997年11月为导流阶段,汛期20年一遇洪水坝前水位于78.
After the impoundment of the Three Gorges Reservoir, it will form a large number of different sizes and different shapes of reservoir bay and flood-draining area, which will provide tremendous space for our fishery development. First, the Three Gorges Reservoir construction progress and the Three Gorges Reservoir annual variation 1, Three Gorges reservoir construction in four stages. From construction preparation (1993) to November 1997 for the diversion phase, flood season in 20 years before the flood dam at 78.