论文部分内容阅读
由林德公司工程部和林德工艺装置有限公司向岳阳中石化、壳牌煤气化公司提供的1套48000m~3/h(O_2)空分装置的合同于2003年12月19日在北京中石化国际事业有限公司签字生效。在合同上签字的需方单位为:中石化国际事业有限公司、中石化兰州设计院、岳阳中石化-壳牌煤气化有限公司;在合同书上签字的供方单位为林德公司工程部(下称LE)和林德工艺装置有限公司(下称LPP)。中石化兰州设计院将按EPC要求负责该装置的工厂工程设计:LE将在LPP协助下进行装置的总体工艺设计及负责对进口部分设备的设计和供货;LPP负责国内部分的设备设计和
A set of 48000m ~ 3 / h (O_2) air separation plant provided by Linde Engineering and Linde Process Co., Ltd. to Yueyang Sinopec and Shell Coal Gasification Company was signed on December 19, 2003 at Beijing Sinopec International Business Limited signature to take effect. The signatories of the contract are as follows: Sinopec International Business Co., Ltd., Lanzhou Design Institute of Sinopec, Sinopec-Yueyang Sinopec-Shell Coal Gasification Co., Ltd. The supplier signing the contract is Linde Engineering Department (LE) And Linde Process Equipment Co., Ltd. (LPP). Sinopec Lanzhou Design Institute will be responsible for EPC plant engineering design of the plant: LE will be LPP assisted with the overall process design of the device and is responsible for the import of some equipment design and delivery; LPP is responsible for the domestic part of the equipment design and