论文部分内容阅读
简述了波音公司对外购标准件入厂复验的要求 ;介绍了沈阳飞机制造公司在转包生产波音飞机部件过程中 ,为保证波音公司对外购标准件入厂复验要求 ,编制波音飞机外购标准件入厂复验文件 ,确定需要进行理化试验的标准件和理化试验项目 ,提出在执行复验文件过程中存在的主要问题及解决方法的情况。
Briefing on the requirements of Boeing Company for the re-inspection of outsourced standard parts into the factory; In the process of subcontracting the production of Boeing aircraft parts by Shenyang Aircraft Manufacturing Company, in order to ensure that Boeing Co., Purchase of standard parts into the factory reinspection documents to determine the need for physical and chemical tests of the standard parts and physical and chemical test items, proposed in the implementation of the reinspection documents exist in the main problems and solutions.