框架梁柱结构,不规则墙体结构、地下工程多采用组合钢模板、定型钢模板施工,剪力墙结构也常采用组合钢模板施工。而目前利用组合钢模板施工时,为承受混凝上对模板的侧压力,一般采用在模板层方木上钻孔穿螺栓(即穿墙螺栓)的方法,这种方法存在以下问题: (1)螺栓穿墙很困难,对面两根方木钻的孔经常对不准,造成钻孔返工,且墙厚不易控制。 (2)螺栓穿墙处要用大量方木,而且拆除方木时损坏较多,混凝土墙面不平。
Frame beam and column structure, irregular wall structure, underground construction mostly use composite steel formwork and shaped steel formwork construction, and shear wall structure often uses combination steel formwork construction. At present, when using the combined steel formwork, in order to withstand the side pressure of the concrete on the formwork, a method of drilling and bolting (ie, through-wall bolts) on the formwork square timber is generally adopted. This method has the following problems: (1) ) It is difficult to bolt through the wall, and the holes of the two square drills on the opposite side are often inaccurate, causing the drilling to be reworked, and the wall thickness is not easy to control. (2) A large amount of square wood is used for bolts through the wall, and more damage occurs when the square wood is removed, and the concrete wall is uneven.