“十五”期间,四川省将投资600亿元,用于水电工程项目建设和电网建设,到2010年,全省电力装机容量达到30GW左右;力争水电装机容量翻一番,达到22GW左右;力争水电资源开发程度翻一番,达到20%;全省用电电量翻一番,达到110TW·h;全省人均年用电量翻一番,达到1200kW·h;川电外送能力力争达到8G~10G万kW。
During the 10th Five-Year Plan period, Sichuan Province will invest 60 billion yuan for the construction of hydropower projects and the construction of power grids. By 2010, the province’s installed capacity for electric power will reach around 30 GW; it will strive to double the installed capacity of hydropower to reach about 22GW; The development of hydropower resources has doubled to 20%; the province’s electricity consumption has doubled to 110TW·h; the per capita annual electricity consumption of the province has doubled to 1200kW·h; Chuandian’s ability to deliver electricity has reached 8G. ~10G million kW.