论文部分内容阅读
这一电视演播中心是利用建于五十年代的一个废置的货栈仓库改建的。在原有结构体系的基础上,建筑师巧妙地进行平面布置和空间划分,使之适合其新功能的要求。技术区和工作间设在中部,并靠近南侧的服务道,其东西两侧为演播室。顾主室、更衣室、休息室和办公室等均设在北侧,这里有大的悬挑阳台俯瞰着码头和水面。建筑的外立面没有做太多的整
The studio was rebuilt using an abandoned warehouse warehouse built in the 1950s. On the basis of the original structural system, the architects cleverly make plane layout and space division to suit the requirements of their new functions. The technical area and the workroom are located in the middle and close to the service lane on the south side. The east and west sides are studios. The main house, dressing room, lounge and office are all located on the north side. There is a large overhanging balcony overlooking the marina and the water. The facade of the building did not do too much