工程建设项目的后评价是与项目建设前期进行的可行性研究相对应的。一般而言,后评价是对项目达到正常生产能力的实际效果与预期效果的分析评价,通过比较取得经验教训并反馈到今后项目的选优、投资决策及经营管理中去,以改进工作,提高效益。进行后评价的目的是:(1) 进行项目本身的“有无对比”,以判别原规划、设计的合理性和经济性,总结经验教训;(2) 进行项目间的“横向对比”,以判别项目的科学性和先进性;(3) 积累充分可靠
The post-evaluation of the engineering construction project corresponds to the feasibility study conducted in the early stage of the project construction. In general, post-evaluation is the analysis and evaluation of the actual and expected effects of the project’s attainment of normal production capacity. It is used to compare lessons learned and feedback to future project selection, investment decisions and operations management to improve work and improve benefit. The purpose of the post-evaluation is to: (1) carry out the “contrast” of the project itself to determine the rationality and economy of the original planning and design, and summarize the lessons learned; (2) carry out the “horizontal comparison” between the projects; Distinguish the scientific nature and advancement of the project; (3) Accumulation is fully reliable