论文部分内容阅读
东接包兰铁路临河站,西至中蒙边境策克口岸的临策铁路,全长768公里。沿线80%的地段是极度干旱区和沙漠边缘地带,沙害影响区段456公里,其中近400公里是无人区。恶劣的自然条件和生活环境,给承担铁路设备维护管理工作的中铁六局电务公司带来了巨大的困难和挑战。这条线路上的计算机区域联锁信号采用的是JWJ-C2型微机计轴设备,
East Linhai Railway Station Bao Lan, west of China and Mongolia border Ceke Port’s strategic railway, a total length of 768 km. 80% of the lots along the line are the extremely arid area and the edge of the desert. The area affected by sand damage is 456 km, of which nearly 400 km is an unmanned area. Harsh natural conditions and living environment, to the railway equipment maintenance and management of China Railway 6th Bureau of Power Company has brought enormous difficulties and challenges. This line on the computer area interlock signal is used JWJ-C2 type microcomputer axis equipment,