论文部分内容阅读
介绍江苏省润杨长江大桥深50m南悬索桥北锚碇基坑高压旋喷防渗墙的设计与施工,并对工程的效果进行了评价。
This paper introduces the design and construction of high pressure jet grouting cutoff wall of North Anchorage Foundation of Nanxun Suspension Bridge of Run Yang Yangtze River Bridge in Jiangsu Province, and evaluates the effect of the project.