论文部分内容阅读
自1954年江苏海门青龙港沉排工程获得成功后,1955年南京浦口下关两岸、1956年安徽裕溪口及马鞍山两地也相继施工。以各地获得的工程效果来看,在我国河岸崩塌的防治上,沉排护岸的施工,今后将会被广泛地采用。由于此项工程的施工方法,一方面,结合了我国目前的具体情况与条件,而有些操作,又系创举,因此,各项操作技术与劳动组合都是在逐步改进、不断提高的基础上获得了成功。关于沉排工程的各项定额,我国过去尚无先例。为了适应今后编制计划的要求,及在施工过程中究研组织与调节等问题,
Since 1954, Jiangsu Haimen Qinglonggang sinking project was successful, in 1955, Nanjing Pukou Shimonoseki cross-strait, Anhui 1956 Anhui Yuxikou and Ma On Shan two places have also been constructed. Based on the project results obtained from all over the country, the construction of bank-sinking and bank protection will be widely adopted in the prevention and control of bank collapse in our country. Due to the construction method of this project, on the one hand, it combines the current situation and conditions in our country with some operations initiated by others. Therefore, all operation techniques and labor combinations are obtained on the basis of gradual improvement and continuous improvement Success. With regard to the quotas for the sinking project, there are still no precedents in the past in our country. In order to meet the requirements of the preparation of plans in the future, and in the construction process of research organizations and regulatory issues,