热电总厂热电二站系燃煤电站,始建于1987年。目前共装有6台供热汽轮发电机组,4台燃煤高温高压锅炉和2台循环流化床锅炉,全站供热发电总量占到公司用户总需求的70~80%。近来,公司各大工程项目陆续建设投产,地区用电用热负荷逐步增加以及热电一站机炉2007年的停运,这些因素使热电二站的安全生产压力更加巨大,并势必对设备状况、运行方式、人员素质等方面提出更高
Thermoelectric Plant Thermoelectric two stations of coal-fired power plant, was founded in 1987. At present, a total of six sets of heating turbine generator sets, four high-temperature coal-fired boilers and two circulating fluidized bed boilers, total station heating power generation accounts for the total user needs of 70 to 80%. Recently, the company gradually put into operation major projects, the regional electricity load and the gradual increase in thermal power station furnace stop furnace in 2007, these two factors make the safety of the two stations more pressure on the production, and is bound to the equipment status, Mode of operation, quality of personnel put forward higher