论文部分内容阅读
“七五”期间,山东省共筹集煤炭、电力建设基金22.85亿元(不包括各地、市自筹部分),占同时期全民所有制基本建设自筹资金的20.4%。 这些资金的筹集,在一定程度上缓解了建设资金不足的矛盾,促进了我省能源工业、基础设施的发展。在“八五”和十年规划期间、山东省准备采取倾斜政策,加快能源工业的发展,努力缓解能源供应紧缺的状况,在长期建设资金筹集方面拟采取以下对策。
During the “Seventh Five-Year Plan” period, Shandong Province raised a total of 2.285 billion yuan of coal and electric power construction funds (excluding self-raised parts by localities and municipalities), accounting for 20.4% of the self-raised funds for capital construction by the whole people during the same period. The mobilization of these funds, to a certain extent, eased the contradiction between the lack of funds for construction and promoted the development of energy industry and infrastructure in our province. During the “Eighth Five-year Plan” and the 10-year planning period, Shandong Province is prepared to adopt a tilt policy to speed up the development of the energy industry and work hard to ease the shortage of energy supplies. The following measures are proposed in terms of long-term construction fund-raising.