“十五”期间计划建设的崇明越江工程(东线),是规划中的沪崇苏高速公路的重要组成部分,从浦东5号沟到崇明陈海公路,全长24.8km,分南港(浦东5号沟—长兴岛)8.2km水域、长兴岛陆地4km、北港(长兴岛—崇明)9.59km 水域(和崇明接线)。目前预可行性研究工作已基本结束,正在加紧准备设计方案的征集和项目招商方案的设计工作。
The Chongming River Project (East Line) planned for the 10th Five-Year Plan period is an important part of the planned Shanghai-Chongsu Expressway. From Pudong No. 5 ditch to Chongming Chenhai Highway, it has a total length of 24.8km and is divided into Nangang (Pudong No.5 Ditch - Changxing Island) 8.2km waters, Changxing Island land 4km, Beigang (Changxing Island - Chongming) 9.59km waters (connecting with Chongming). The pre-feasibility study has basically ended, is stepping up the collection of design proposals and project investment program design.