我厂氨压缩机房,于1981年5月14日,突然发现设备间地坪裂纹处,向外冒水。这是由于埋在地下1.2m深的φ150mm冲霜管道破裂所致,大量自来水冲出破口,渗人机房地下约7米深的回填土内。泥土吸水饱和后,水便从地坪裂纹冒出来。为了阻止该水继续渗入地下,立即关闭了供水站总阀,全厂被迫停产。欲及时挖出破管,进行修复,由于回填的活性沙土吸水饱和,似流沙一样向挖沟中倾涌,因而立即停止了开挖,并及时用干炉渣、水泥填充了槽沟。随后的两三天内,陆续发现设备间及机房各处地坪,不同程度的下沉,最大下沉量5—
Ammonia compressor room in our factory, on May 14, 1981, suddenly found equipment cracks at the floor, run out to the outside. This is due to buried in the ground 1.2m deep φ150mm red cream pipeline rupture caused by a large amount of tap water out of the breach, seepage into the engine room underground about 7 meters deep within the backfill. After the soil is saturated with water, the water will emerge from the floor crack. In order to prevent the water continued to infiltrate the ground, immediately shut down the water supply station, the whole plant was forced to stop production. In order to promptly excavate the broken pipe and repair it, as the activated sand of the backfill is saturated with water, it is like a quicksand flowing into the trenches. As a result, the excavation is stopped immediately and the trenches are filled with dry slag and cement in time. Subsequent two or three days, one after another found that equipment and room floor Ping, varying degrees of sinking, the maximum sinking 5-